2011-2012 Norway
The dynamically positioned vessel (DP 3 system)
Performed works:
Electrical installations in accommodation areas(meeting room, reception)- Cable pulling, connections, el. metal works
Cabins- Lighting, sockets, heating, cable pulling, connections
Engine room- Lighting, el. metal works
Switchboards- Cable pulling, connections, IAS connections
Outside decks- Lighting